Third to fifth floor Two Riverside

Prime, fully fitted self-contained workspace

Building upgrade works at Two Riverside with a focus on enhancing the occupier experience.

In recent years, we completed a significant building upgrade that included the addition of end-of-trip amenities such as showers, a drying room, and secure basement-level bicycle parking and the replacement of gas boilers and chillers with heat pumps, fully decarbonising the building’s heating and cooling systems. We also installed PV solar panels to generate onsite energy and upgraded the Building Management System (BMS).

Following this significant upgrade, we achieved LEED Operations and Maintenance Gold certification. We have now started work on upgrading the reception area, which includes three new lifts, and the rear garden.

Location

Sir John Rogerson’s Quay, Dublin 2

Space available

Part third floor

6,000 sq ft
Furnished & Managed
Available Q4 2025

Part third floor

6,000 sq ft
Furnished & Managed
Available Q4 2025

Fourth floor

12,000 sq ft
Furnished
Available Q4 2025

Fifth floor

12,000 sq ft
Furnished
Available Q4 2025

Agents
Agents
Knight Frank
Jim O’Reilly
+353 (0)1 634 2466
jim.oreilly@ie.knightfrank.com
image

CGI of reception area at Two Riverside

Transport connections

mins
walk to bus stop
mins
walk to Dublin Bikes
mins
walk to LUAS Red Line
mins
walk to DART/Rail station
mins
drive to Port Tunnel
mins
drive to Dublin Airport